<Your Project Name Here>
Project Legacy
<Course, Semester, Year>
Modification history:
|
Version
|
Date
|
Who
|
Comment
|
|
v0.0
|
08/15/00
|
G. H. Walton
|
Template
|
|
v1.0
|
<date here>
|
<who>
|
<put comment to summarize the changes made in this
version>
|
|
...
|
|
|
|
Team Name: <your team name here>
Team Members:
- <person1 and that person's e-mail and web page -- name
and links>
- <person2 and that person's e-mail and web page -- name
and links>
- ...
Roles
<For each chunk of work for the project: (for example:
ConOps, Project Plan, SRS, Project Management, Design, Code, Documentation,
CM, QA, Final Deliverables), tell what roles were performed by each team member
and approximately what percent of the work was done by each team member. >
Analysis
<Analyze all the process and product metrics for your group's
project. Combine this information with your understanding of what actually occurred
during the project. Based on this information, provide the following analysis
(A minimum of one or two well-thought sentences must be provided for each question
listed under each bullet. Note that the content of this document must demonstrate
a depth of understanding of your project's process and products -- your successes
and your challenges.):>
- Assessment of the Quality of the Final Product: <Provide
a specific description of your assessment of the quality of the final set
of deliverables. (does the product work? How well? under what circumstances?
>
- Recommended Use of the Final Product: <Provide specific
recommendations about the circumstances under which the final set of deliverables
can and should be used >
- Known Problems: <Provide a detailed list of known problems
and work not finished on this project. >
- Adherence to Project Plan: <How well did your group adhere
to your project plan? How accurate were your project estimates? How closely
did you adhere to your planned process? What was the root cause of deviations
from your estimates? >
- Defect Analysis: <Analyze the defects logged by members
of your group: number and types of defects at each phase in the project life
cycle? Phase the defects were introduced versus phase the defects were discovered
and corrected?.>
- Quality Assurance: <Consider the QA and testing activities
your group actually performed. Were they sufficient? Were they timely? How
could they have been improved? >
- Configuration Management: <Consider the CM practices of
your group. Were they sufficient? How could they have been improved? >
- Suggestions for the Future: <What suggestions do you have
for improvement of your group's technical processes for projects of a similar
size and scope? What suggestions do you have for future project teams? What
parts of your process would you change and what would you keep if you were
assigned to work on a project of roughly 10 times the size and scope of this
project? What about100 times the size and scope?>
Template created by G. Walton (GWalton@mail.ucf.edu)
on Octber 8, 1999 and last modified on August 15, 2000.
This page last modified by <your name here>
(<your e-mail address text and link here> ) on <modification
date here>